Design documentation and external power supply design for data center
UNIVERSAL MOBILE SYSTEMS MCHJ · TIN 303020732 · Karakalpakstan
- Budget
- 168 mln UZS
- Bids due
- 20.11.2026 09:49
- Bid security
- none
- Advance payment
- 15%
- Newcomer's chance
- 74 / 100
- Lot number
- 26120012524151
Risks and upsides
- No bid security — No need to tie up cash.
- Advance payment 15% — Part of the money comes before work starts.
At a glance
Buyer is looking for a contractor to develop design and estimate documentation (PSD) for a data center (MQIM) on the 1st floor of the UMS LLC building in Nukus, To‘rtko‘l shossesi, 138-a, and to design external power supply. Quantity: 1 service; advance payment 15%, payment within 10 days; lowest price wins among qualified bidders, passing score 99.
Bidder requirements
- Develop PSD to the scope and parameters of the technical specifications
- Have qualified specialists on staff or under contract
- Specify a warranty period for the work results
- Meet the deadlines set out in the documentation
- Confirm available technical, financial and personnel resources
- Have no tax arrears, bankruptcy, entries in the register of unreliable suppliers or conflicts of interest, and submit an anti-corruption declaration
Evaluation criteria
- Conditions for performing works and providing services: compliance with the volume, technical parameters and requirements provided in the technical specifications — up to 20 pts
- Conditions for performing works and providing services: compliance with the volume, technical parameters and requirements provided in the technical specifications — up to 16 pts
- Requirements for the availability of qualified specialists required to perform the works or provide the services, either employed or engaged under contract — up to 16 pts
- Conditions for performing works and providing services: compliance with the volume, technical parameters and requirements provided in the technical specifications — up to 16 pts
- The period(s) during which works and services must be provided, or a specific date by which works must be completed and services rendered, or the shortest period for performing works and providing services acceptable to the state customer — up to 16 pts
- Requirement to specify the warranty period for the quality of works and service results — up to 16 pts
What's being bought
- Design and estimate documentation development service for residential building construction — 1 — 168 mln UZS
Open on the platform. Documents and specs are on the platform.
Doing the design for this lot? Try Chizmax
Tell the AI what to draw, the way you'd brief an AutoCAD drafter: plans, diagrams, details. The finished drawing comes as a DXF file. Start a project in Chizmax
How to bid: guides
- Uzbekistan tenders on etender.uzex.uz: how to take part
- Tender technical specification in Uzbekistan: 11-point checklist
- Bid deposits in Uzbekistan public procurement: rates and refunds
- How to win a public tender in Uzbekistan: a step-by-step plan
Similar lots
- Transformer substation design services — 41 mln UZS · Bids due 13.11.2026 10:01 · Fergana region
- Design and cost estimate documentation services for current repairs of a building — 2.8 mln UZS · Bids due 12.11.2026 13:01 · Fergana region
- Design and estimate work services — 20 mln UZS · Bids due 12.11.2026 10:26 · Surkhandarya region
- Design and cost estimate documentation services for current repairs of a building — 40 mln UZS · Bids due 13.11.2026 16:50 · Tashkent region
- Design and estimate documentation development services for non-residential building construction — 24 mln UZS · Bids due 13.11.2026 14:22 · Andijan region
- Design services for a gas supply project — 3.5 mln UZS · Bids due 13.11.2026 16:22 · Karakalpakstan