Construction of at-grade pedestrian crossing at the intersection of Dahbed and Rudakiy streets in Samarkand city, 2026 (road infrastructure)
Samarqand Mintaqaviy Yo`llarga Buyurtmachi Xizmati · TIN 207254149 · Samarkand region
- Budget
- 550 mln UZS
- Bids due
- 05.11.2026 23:59
- Newcomer's chance
- 58 / 100
- Lot number
- 26411012300000
Risks and upsides
- Bid security, requirements and documents: see the platform — The platform's public list doesn't show them. Open the lot on the platform before you bid.
- New lot: published less than 24 hours ago
Open on the platform. Documents and specs are on the platform.
How to bid: guides
- Tender technical specification in Uzbekistan: 11-point checklist
- Why tender bids get rejected in Uzbekistan and how to avoid it
- E-signature (EDS) and E-imzo for public procurement in Uzbekistan
- How to win a public tender in Uzbekistan: a step-by-step plan
Similar lots
- Build a pedestrian crossing at km 270 of the M37 Samarkand–Bukhara–Turkmenbashi road — 253 mln UZS · Bids due 03.11.2026 23:59 · Umumiy Foydalanishdagi Avtomobil Yo`llarini Qurish Va Rekonstruksiya Qilish Direksiyasi · Bukhara region
- Laying asphalt pavement and building pedestrian walkways on Navkar Street, Navkar mahalla — 1.5 bn UZS · Bids due 29.10.2026 23:59 · Navoiy Mintaqaviy Yo'llarga Buyurtmachi Xizmati Duk · Navoi region
- Construction of a pedestrian walkway on T. Khojamurodov Street in G'ambur MFY (installation of gutter covers) — 295 mln UZS · Bids due 02.11.2026 23:59 · Surxondaryo Mintaqaviy Yo`llarga Buyurtmachi Xizmati · Surkhandarya region
- Repair and asphalt paving of Boğbon, Ipak yuli and IbnSino streets; construction of a bus stop and pedestrian walkway — 1.6 bn UZS · Bids due 30.10.2026 23:59 · Jizzax Mintaqaviy Yo`llarga Buyurtmachi Xizmati · Jizzakh region
- Construction of a pedestrian walkway in the Sharq massif area, Sharq neighborhood committee — 742 mln UZS · Bids due 30.10.2026 23:59 · Navoiy Mintaqaviy Yo'llarga Buyurtmachi Xizmati Duk · Navoi region
- Construction of a 1,300-meter pedestrian walkway in the Pakhtakor MFY, Fabrika settlement — 518 mln UZS · Bids due 04.11.2026 23:59 · Sirdaryo Mintaqaviy Yo`llarga Buyurtmachi Hizmati Uk · Syrdarya region